<em id="jz77l"></em>

          <nobr id="jz77l"></nobr>

            <video id="jz77l"></video>

              project

              PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
              Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE
              project

              DOHA METRO-GREEN LINE

              Adding time: 2019.08.30

              Share
              Concrete Placing Boom in Malaysia

              Project Description:

              Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

              The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


              Truemax Solutions:

              Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


              Job Site: Qatar


              六九公社-欧美AV在线,国产av在线,免费国产偷拍a在线视频 - 69公社 <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>